PROJECT NAME:
						
						
							THE MONITORING OF HYDROENERGY CONSTRUCTION FACILITIES
						
						
							BENEFICIARY:
						
						
							SC HIDROELECTRICA SA
						
						
							NEED:
						
						
							Verifying the stability and integrity of the objective in order to maintain its safety and ensure its functionality
						
						
							MAIN DELIVERABLES:
						
						
							- 
								Carrying out geodetic measurements to detect the displacements of the construction:
								
									- vertical displacements - through geometric levelling with 2 horizons
- horizontal displacements - through microtriangulation method
 
- Determination of marking/and control points
- Verifying the support network
- Processing and interpreting purchased data
- Realizing the report with the initial observations
							CUSTOMER BENEFITS:
						
						
							- Continuous monitoring of the state of construction
- Detecting the appearance of atypical behaviors or abnormal phenomena that affect the stability and safety of the structure
- Preventing and / or reducing the possibility of breaking hydrotechnical objectives
- Periodic analysis and evaluation of vulnerabilities and risk  factors
- Preventing and reducing incidents
							The measurements were made using the total station TS 06 Plus and the LEICA Digital 250 M.